E&K Construction

Office Building

WCI will be erecting a series of two buildings for E&K Construction. Erection of the office began in January of 2021 and construction of the warehouse building began in mid February.

The office building is a single slope structure that will utilize American Buildings' Standing Seam 360 galvalume roof panels. This building will have a four foot canopy overhang with soffit panels around the perimeter of the roofline. There will be no metal panels along the walls of this building, instead WCI is installing full length spandrel beams to support a stone façade as well as a full length window system.

Construction on both buildings is expected to be completed by March 1, 2021. 

North Side
North Side
Office North Side
Office North Side
Simple Saver & Soffit
Simple Saver & Soffit
Simple Saver System
Simple Saver System
Primary and Secondary Steel
Primary and Secondary Steel
Columns
Columns