E&K Construction

Office Building

WCI erected a series of two buildings for E&K Construction. Erection of the office began in January of 2021 and construction of the warehouse building began in mid February.

The office building is a single slope structure that will utilize American Buildings' Standing Seam 360 galvalume roof panels. This building will have a four foot canopy overhang with soffit panels around the perimeter of the roofline. There will be no metal panels along the walls of this building, instead WCI is installing full length spandrel beams to support a full length window system as well as an EIFS wall.

Construction on both buildings was completed in April, 2021. 

Final Photo
Final Photo
press to zoom
Breezeway Completed
Breezeway Completed
press to zoom
Breezeway Installation
Breezeway Installation
press to zoom
EIFS Complete
EIFS Complete
press to zoom
North Side
North Side
press to zoom
Office North Side
Office North Side
press to zoom
Simple Saver & Soffit
Simple Saver & Soffit
press to zoom
Simple Saver System
Simple Saver System
press to zoom
Primary and Secondary Steel
Primary and Secondary Steel
press to zoom