Harris Trucking

WCI was the general contractor on this project for Harris Trucking; overseeing site preparations, utility work, concrete work, building erection and more.  This building will be approx. 19,600 sq./ft. with a footprint of 100' x 196'.

The American Buildings' building package was delivered on the 25th of August, 2021 and site preparations are ongoing.  Building erection began in September 2021.

The exterior of the building features stucco embossed and striated insulated metal panels installed on 8'' bypass girts as well as flush girts to give the buildings' exterior walls different textures and depths.

This single slope roof system used Americans' Standing Seam 360 panels and an 8'' rolled R-19 vinyl faced insulation system. 

West Sidewall
West Sidewall
press to zoom
NW Corner
NW Corner
press to zoom
Panels & Trims Complete
Panels & Trims Complete
press to zoom
Low Sidewall Completed
Low Sidewall Completed
press to zoom
Panels Complete
Panels Complete
press to zoom
Insulated Panel Installation
Insulated Panel Installation
press to zoom
Insulated Panel Installation
Insulated Panel Installation
press to zoom
Primary and Secondary Steel Completed
Primary and Secondary Steel Completed
press to zoom
Primary and Secondary Steel
Primary and Secondary Steel